Rural hydropower and electrification郾 In 2016, the completed investment of rural
hydropower station construction amounted to 24郾 9 billion Yuan; the newly increased
hydropower stations were 312, with a total installed capacity of 2郾 03 million
kW郾 Installed capacity of new production reached to 1郾 55 million kW, Net capacity
of power generation by technological transformation reached to 0郾 48 million kW.
The completed investment for rural electricity network in the whole country was 8郾 4
billion Yuan; the newly increased capacity of 110kV substation or above was 3郾 66
million kVA; the newly increased capacity of 35 (63) kV substation was 1郾 31 million
kVA; the capacity of distribution transformer was 5郾 95 million kVA郾 The newly鄄
added high pressure transmission line and low pressure line were 17郯 000 km and
32郯 000 km, respectively郾
Soil and water conservation郾 A total of 52郾 00 billion Yuan was allocated to
construction of soil and water conservation and ecological restoration project in
2016, with an accumulated investment of 47郾 31 billion Yuan郾 The newly鄄added
areas with soil conservation measures reached 56郯 200 km2 , of which the area
under National Major Project for Soil Conservation was 11郯 600 km2郾 The newly鄄
added area for protection of forest reached 16郯 000 km2郾 There were 221 silt鄄
retention dam on Loess Plateau at high risk were strengthened and rehabilitated郾
The newly built basic farmlands were 574郯 000 ha ( including slope farmland) 郾 The
newly鄄built forestland for conserving soil and water reached 1郯 690郯 000 ha and
grassland 423郯 000 ha郾
Capacity building郾 The completed investment for capacity building in 2016 was
3郾 80 billion Yuan, of which 0郾 44 billion Yuan spent on procurement of
communication equipment for flood control, 1郾 53 billion Yuan for hydrological
facilities, 0郾 14 billion Yuan for scientific research and education facilities and 1郾 69
billion Yuan for others郾