Page 12 - Water Standards
P. 12

complete  and  submit  them  in  time.  The  project  legal  person
            shall  examine  the  completeness  and  normalization  of  the  submit-
            ted  acceptance  documents.
            1.0.11  Documents  of  acceptance  are  divided  into  those  “ shall
            be  provided”  and those “ ready  for  check” .  The  relevant  organi-
            zations  shall  ensure  the  authenticity  of  the  provided  documents
            and  bear  the  corresponding  responsibility.  Lists  of  documents
            needed  to  be  provided  or  ready  for  check  are  shown  in  Annex  A
            and  Annex  B  respectively.
            1. 0. 12  Drawings,  data  and  final  documents  shall  be  prepared
            in  line  with  the  requirements  for  completion  acceptance  docu-
            ments.  Except  drawings,  the  paper  size  should  comply  with  in-
            ternational  standard  of  A4  (210mm× 297mm).  Original  copy of
            documents  shall be stamped and shall not be replaced by any cop-
            ies.
            1. 0.13  Acceptance  fees  shall  be  included  in  the  project  cost  es-
            timation  and disbursed by the project legal person or paid accord-
            ing to  the  contract.
            1. 0. 14  In  addition  to  this  code,  the  acceptance  of  a  small  hy-
            dropower  project  shall  also  conform  to  the  current  standards  of
            the  country.
   7   8   9   10   11   12   13   14   15   16   17