Page 12 - Water Standards
P. 12
complete and submit them in time. The project legal person
shall examine the completeness and normalization of the submit-
ted acceptance documents.
1.0.11 Documents of acceptance are divided into those “ shall
be provided” and those “ ready for check” . The relevant organi-
zations shall ensure the authenticity of the provided documents
and bear the corresponding responsibility. Lists of documents
needed to be provided or ready for check are shown in Annex A
and Annex B respectively.
1. 0. 12 Drawings, data and final documents shall be prepared
in line with the requirements for completion acceptance docu-
ments. Except drawings, the paper size should comply with in-
ternational standard of A4 (210mm× 297mm). Original copy of
documents shall be stamped and shall not be replaced by any cop-
ies.
1. 0.13 Acceptance fees shall be included in the project cost es-
timation and disbursed by the project legal person or paid accord-
ing to the contract.
1. 0. 14 In addition to this code, the acceptance of a small hy-
dropower project shall also conform to the current standards of
the country.