Page 10 - Water Standards
P. 10
erator startup) , the special item acceptance and the completion
acceptance. The presiding organization may add acceptance
types and specific requirements if necessary.
1.0.4 The acceptances of small hydropower projects shall be
based on the following items:
—Current laws, regulations, rules and technical standards
of the country.
Regulations of relevant departments.
—Approved project documents, design documents and cor-
responding revised design.
—Construction drawings, key equipment contracts and
technical instructions.
— Construction contracts in case of legal person acceptances.
1. 0. 5 The acceptance of a small hydropower project shall in-
clude the following contents:
1 Examination of whether the completed part of the project
meets the requirements of approved design documents.
2 Examination of the quality of the completed project re-
garding design, construction and equipment manufacture and in-
stallation as well as the situation regarding the collection, ar-
rangement and filing of relevant materials.
3 Examination of whether the project meets the conditions
for operation or further construction.
4 Examination of investment control and capital expendi-
ture.
5 Suggestions for solving remaining problems of accept-
ance.
6 Comments for the project construction.
1. 0. 6 Acceptance of a project shall be organized in time when it
meets all the requirements. If a project has not been accepted or