Page 5 - Water Standards
P. 5
— Acceptance of unit projects.
— Acceptance of contracted project completion.
— Acceptance of special item.
— Project handover and handling of leftover problems.
— Adjusting the contents of stage acceptance and addition of
the previous acceptance of turbine-generator startup to the
stage acceptance.
— Adjusting the contents of completion acceptance, cancel-
lation of preliminary acceptance and addition of self-in-
spection for completion acceptance and technical pre-ac-
ceptance of completion.
In this code, Article 1. 0. 6 is compulsory provision, marked
in bold type, and must be enforced strictly.
This code replaces the previous version SL 168— 96.
This code is approved by the M inistry of Water Resources
(M W R ) of the People’s Republic of China.
This code is interpreted by Bureau of Rural Hydropower and
Electrification Development of MWR.
This code is chiefly drafted by National Research Institute
for Rural Electrification of MWR.
This code is jointly drafted by Sichuan Local Electricity Bu-
reau, and Zhejiang Hydropower Administration Center.
Chief drafters of this code are Liu Zhongmin, Fan Xinzhong, Lin
Xuxin, Qiu Jianghai, Yu Zhenkai,Song Chao, Wu Jianzhang, Lv
Yan, Lu Xiaoping, and Shu Jing.
The text of this code is published and distributed by China
Water & Power Press.
The technical responsible person of this Code review meet-
ing is Tang Tao.
The format examiner of this code is Cao Yang.