Page 37 - 2017年全国水利发展统计公报
P. 37
allocated 15郾 4 billion Yuan for the construction of irrigation systems and
rehabilitation of irrigation districts for water saving purpose郾 There were 32郾 79
billion Yuan allocated to the construction and operation and maintenance of small鄄
scale farmland waterworks for irrigation and drainage郾 The newly鄄added effective
irrigated area reached 1郯 070郯 000 ha; new鄄added water鄄saving irrigated area was
2郯 100郯 000 ha and newly鄄added highly鄄efficient water鄄saving irrigated area was
1郯 639郯 000 ha郾
Rural hydropower and electrification郾 In 2017, the completed investment of rural
hydropower station construction amounted to 20郾 0 billion Yuan; the newly increased
hydropower stations were 161, with a total installed capacity of 1郾 353 million kW,
among which the newly increased installed capacity amounts to 1郾 003 million kW,
and the increased installed capacity by rehabilitation accounts to 0郾 35 million kW郾
The completed investment for rural electricity network in the whole country was 5郾 53
billion Yuan; the newly increased capacity of 110kV substation or above was 3郾 512
million kVA; the newly increased capacity of 35 (66) kV substation was 0郾 624
million kVA; the capacity of distribution transformer was 3郾 185 million kVA郾 The
newly鄄added high pressure transmission line and low pressure line were 24郯 000 km
and 72郯 000 km, respectively郾
摇 摇 摇 33摇