Page 52 - 2010年全国水利发展统计公报
P. 52

2010年

                                                                                     全国水利发展统计公报

qualification. There were 4 enterprises awarded the Class-A qualification of
supervisors for electromechanical and metal equipment manufacture and 7
awarded Class-B qualification. There were 27 enterprises awarded the qualification
(no grading is defined) of supervisors for environment protection of water project
construction. In 2010, there were 38 Class-A quality inspection organizations for
geotechnical engineering approved; 52 Class-A quality inspection organizations
for concrete structures; 10 Class-A quality inspection organizations for metal
structures; 6 Class-A quality inspection organizations for mechanical and electronic
equipment; and 24 Class-A quality inspection organizations for measuring and
gauging tools.

Reform of rural water resources management. The total number of Water
User Associations (WUAs) established in the whole country reached more than	
52,000, The irrigated area under administration amounts for 23% of the total
effected irrigated area in the country. Reform of property right has been applied
to more than 7 million small on-farm water structures along with the promotion of
reform of small on-farm water structures management system.

Soil and water conservation. There were 23,000 Soil and Water Conservation
Plans in water development projects examined and approved, of which 278 are
large-scale construction projects developed by MWR and cover an area of 4,626
km2. There were 127 large and medium soil and water conservation projects
completed check and acceptance. Capacity building for soil and water conservation
supervision and management has been reinforced and first lot of 510 counties had
further strengthened its functions of supervision and management. A total of 49
science and technology demonstration zones were approved in the whole country
along with promotion of construction of pilot project construction. Two regulations,
namely Temporary Management Provisions on Silt Retention Dam Construction
and Operation in Loess Plateau Region and Norms on Check and Acceptance of
National Key Soil and water Conservation Project.

                                                                                          47
   47   48   49   50   51   52   53   54   55   56   57