Page 55 - 2010年全国水利发展统计公报
P. 55
2010年 全国水利发展统计公报
2010 Statistic Bulletin on China Water Activities
with long-term post amounted to 1.0369 million, a 0.05% decrease. In the
employees with long-term post, the staff working in the agencies directly under the
Ministry of Water Resources was 74,200, a 3.12% increase over last year; the staff
working in local agencies was 0.9626 million, a 0.29% decrease. The total salary
for the employees with long-term post in the whole country was 29.791 billion Yuan
in 2010, a 12.53% increase comparing to that of 2009. The average salary per
employee with long-term post was 28,816 Yuan, a 12.42% increase over 2009. Of
which the per capita salary of agencies directly under MWR was 59,553 Yuan, a
9.78% increase, and the average salary per employee with long-term post of local
agencies was 26,447 Yuan, a 12.6% increase.
Employees and Salaries
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
number of in-service staff(104 persons) 138.1 131.4 128.9 122.9 118.2 110.5 109.2 106.76 105.57 103.74 106.63
of which, staff of MWR and agencies 6.8 6.6 6.4 6.4 6.4 6.6 6.8 7.15 7.22 7.20 7.42
under MWR(104 persons) 131.4 124.9 122.5 116.5 111.8 103.9 102.3 99.61 98.35 96.54 96.26
local agencies(104 persons)
salary of in-service staff (108 Yuan) 115.5 129.3 136.3 140.6 157.1 159.8 184.3 211.28 234.37 264.74 297.91
average salary (Yuan/person) 8,430 9,838 10,652 11,443 13,054 13,969 16,776 19,573 22,143 25,633 28,816
Reconnaissance and design. There were 97 reconnaissance’s and design
institutions awarded the Class-A qualification, and 416 institutions warded class-B
qualification, with a total staff of more than 70,000. According to statistics and data
collected from 40 Class-A reconnaissance and design institutes directly under
the Ministry of Water Resources, river basin commission (share controlling) and
provinces (autonomous regions, municipalities), in the income of reconnaissance
and design in 2010, 14% came from projects entrusted by the water administrative
department, 63% came from the market and 23% from consultation or supervision
services. The work completed by these institutes included 775,200 standard m
of drilling, 28,000 standard m of audits, 22,300 standard m of shafts, 549,600
standard m3 of pits, 35,700 standard km2 of engineering survey, and 839,200
standard points of geophysical prospecting.
50