Page 55 - 2010年全国水利发展统计公报
P. 55

2010年 全国水利发展统计公报
                2010 Statistic Bulletin on China Water Activities

       with long-term post amounted to 1.0369 million, a 0.05% decrease. In the
       employees with long-term post, the staff working in the agencies directly under the
       Ministry of Water Resources was 74,200, a 3.12% increase over last year; the staff
       working in local agencies was 0.9626 million, a 0.29% decrease. The total salary
       for the employees with long-term post in the whole country was 29.791 billion Yuan
       in 2010, a 12.53% increase comparing to that of 2009. The average salary per
       employee with long-term post was 28,816 Yuan, a 12.42% increase over 2009. Of
       which the per capita salary of agencies directly under MWR was 59,553 Yuan, a
       9.78% increase, and the average salary per employee with long-term post of local
       agencies was 26,447 Yuan, a 12.6% increase.

                                                                   Employees and Salaries

    	 2000	 2001	 2002	 2003	 2004	 2005	 2006	 2007	 2008	 2009	 2010

       number of in-service staff(104 persons)	 138.1	 131.4	 128.9	 122.9	 118.2	 110.5	 109.2	 106.76	 105.57	 103.74	 106.63

    	  of which, staff of MWR and  agencies    6.8	 6.6	 6.4	 6.4	 6.4	 6.6	 6.8	 7.15	 7.22	 7.20	 7.42
       under MWR(104 persons)                131.4	 124.9	 122.5	 116.5	 111.8	 103.9	 102.3	 99.61	 98.35	 96.54	 96.26

    local agencies(104 persons)	

       salary of in-service staff (108 Yuan)	 115.5	 129.3	 136.3	 140.6	 157.1	 159.8	 184.3	 211.28	 234.37	 264.74	 297.91

       average salary (Yuan/person)	         8,430	 9,838	 10,652	 11,443	 13,054	 13,969	 16,776	 19,573	 22,143	 25,633	 28,816

       Reconnaissance and design. There were 97 reconnaissance’s and design
       institutions awarded the Class-A qualification, and 416 institutions warded class-B
       qualification, with a total staff of more than 70,000. According to statistics and data
       collected from 40 Class-A reconnaissance and design institutes directly under
       the Ministry of Water Resources, river basin commission (share controlling) and
       provinces (autonomous regions, municipalities), in the income of reconnaissance
       and design in 2010, 14% came from projects entrusted by the water administrative
       department, 63% came from the market and 23% from consultation or supervision
       services. The work completed by these institutes included 775,200 standard m
       of drilling, 28,000 standard m of audits, 22,300 standard m of shafts, 549,600
       standard m3 of pits, 35,700 standard km2 of engineering survey, and 839,200
       standard points of geophysical prospecting.

50
   50   51   52   53   54   55   56   57   58