Page 51 - 2016年全国水利发展统计公报
P. 51

for water and hydropower project construction, 53 Class鄄B qualification and 107
Class鄄C qualification郾 There were 5 enterprises awarded as Class鄄A qualification of
supervisors for soil and water conservation project construction, 14 Class鄄B
qualification and 31 Class鄄C qualification郾 There were 2 enterprise awarded as
Class鄄A qualification of supervisors for electromechanical and metal equipment
manufacture and 6 Class鄄B qualification郾 A total of 11 enterprises met the
qualification ( no classification is given) of supervisors for environment protection of
water project construction郾 There were 21 enterprises awarded as Class鄄A quality
inspection organizations for geotechnical engineering approved; 29 Class鄄A quality
inspection organizations for concrete structures; 9 Class鄄A quality inspection
organizations for metal structures; 3 Class鄄A quality inspection organizations for
mechanical and electronic equipment; and 6 obtained Class鄄A organization for
quality inspection郾

By the end of 2016, the approved national water scenery spots reached 778,
including 352 reservoirs, 166 natural rivers and lakes, 160 lake or riverine cities, 42
wetlands, 27 irrigation districts and 31 soil conservation areas郾

Reform in rural water resources management郾 The experiences obtained from
pilot projects for reform of management system of irrigation and drainage and rural
water supply in provinces of Yunnan, Shandong, Anhui, Gaungxi, Sichuan and
Xinjiang had been widely extended to other provinces and adopted in an innovative
way郾 Private sector has actively engaged and participated in the construction,
operation and maintenance of farmland waterworks郾 In 2016, the funding from
private sector to high鄄efficient water鄄saving irrigation amounted to 13% of the total
investment郾 There were 74 out of 100 pilot counties implementing reform of property
right of farmland waterworks and innovative operation and maintenance mechanism
had completed more than 70% of their mission and tasks, among which 21 counties
had fully completed their assignments郾 The coverage rates of cost of basic personal

                                                                                                          摇47摇
   46   47   48   49   50   51   52   53   54   55   56