Page 49 - 2016年全国水利发展统计公报
P. 49
implemented郾
Water diversion of first phases of South鄄to鄄North Water Diversion Project had been
conducted in order to satisfy water demand of five provinces or municipality in the
North: 602 million m3 were diverted by Phase鄄I of Eastern Route Scheme to
Shandong; 3郾 719 billion m3 of water diverted from Phase鄄I of Middle Route Scheme
to Beijing, Tianjing, Hebei and Henan郾 Integrated regulation of water resources of
major rivers including Yellow River and Heihe has been strengthened that prevented
drying up of Yellow River mainstream for 17 consecutive years and Juyanhai East in
the downstream of Heihe River for 13 consecutive years郾 Assessments of carrying
capacity of water resources were completed for Beijing, Tianjing, Hebei and other 8
pilot areas郾 NDRC issued 13th Five鄄Year Plan for Construction of Water鄄saving
Society, Action Plan for Control of Total Water Consumption and Its Intensity in 13th
Five鄄Year Plan Period and Action Plan for Nationwide Water Conservation Drive郾
There were 618 drinking water sources included in the List of National Major Drinking
Water Sources郾 Progress had been made by 105 pilot projects for implementing
water ecological civilization campaign, with Jinan City passed the joint check and
acceptance of the province and ministries郾 Project of Linking 62 River鄄Lake Water
Systems had been carried out that connected 162 rivers and lakes, with an
accumulative allocation of 3 billion Yuan from the central government finance郾
The pilot project in Hebei Province had reduced abstraction of 3郾 78 billion m3
groundwater and water receiving areas of Phase鄄I of the Middle Route Scheme of
South鄄to鄄North Water Diversion reduced 278 million m3 of groundwater withdrawal郾
Phase鄄I of National Project of Capacity Building for Water Resources Monitoring was
completed and Phase鄄II was initiated郾 Guidance for Strengthening Regulation of
Purpose of Water Resources Utilization and Interim Measure for Management of
摇45摇

