Page 57 - 2015年全国水利发展统计公报
P. 57
Name of index Continued
(2) Water resources project
Unit 2010 2011 2012 2013 2014 2015
(3) Soil and water conservation and 108 yuan 1070郾 5 1284郾 1 1911郾 6 1733郾 1 1852郾 2 2708郾 3
ecological recovery
108 yuan 85郾 9 95郾 4 118郾 1 102郾 9 141郾 3 192郾 9
(4) Hydropower projects
(5) Capacity building 108 yuan 105郾 4 109郾 0 117郾 2 164郾 4 216郾 9 152郾 1
(6) Early鄄stage work 108 yuan 19郾 6 40郾 2 59郾 6 52郾 5 40郾 9 29郾 2
(7) Others 108 yuan 24郾 9 42郾 0 40郾 7 40郾 7 65郾 1 101郾 9
108 yuan 329郾 1 496郾 9 291郾 1 328郾 2 244郾 2 337郾 5
Notes:
1郾 The data in this bulletin do not include those of Hong Kong, Macao and Taiwan郾
2郾 Irrigated area in 2013 is integrated with data of first national survey on water
resources郾 Other key indicators for water development and statistical data in
2012 is also integrated with the data of first national survey on water resources郾
Among which, the length of embankment is further clarified as grade鄄V or above
after the data is integrated with that of first national survey on water resources郾
3郾 The number of irrigation districts at 10郯 000 mu and its irrigated area is calculated
based on the number of irrigation districts that have 10郯 000 mu of effective
irrigated area or above in 2011郾 However, the statistics in 2012 is based on
designed irrigated area that reached or upper to 10郯 000 mu郾 Correction is made
to the irrigated areas of irrigation districts over 300郯 000 mu in 2015郾
4郾 Statistics of rural hydropower refer to the hydropower stations with an installed
capacity of 50郯 000 kW or lower 50郯 000 kW郾 Among which the national installed
capacity of hydropower and its annual power generation by the end of 2015 are
sourced from Statistics of China Power Industry issued by China Electricity
Council郾
摇53摇