Irrigation, drainage and rural water supply郾 The investment to the under鄄
                  constructed projects for providing safe drinking water worthies 106郾 39 billion Yuan,
                  with an accumulated investment of 89郾 38 billion Yuan郾 The newly increased
                  capacity helped 67郾 09 million rural residents and school teachers and students
                  access to safe drinking water郾 By the end of 2015, the beneficial rural population
                  who have centralized water supply made up a percentage of 82郾 4% of the total郾
                  The Central Government allocated 19郾 14 billion Yuan ( including 16郾 83 billion Yuan
                  listed in Key Water Project) for completion of counterpart systems and rehabilitation
                  of 151 large irrigation districts for water saving purpose, 10 newly鄄constructed
                  irrigation districts, rehabilitation of large irrigation and drainage pumping stations in
                  10 provinces, construction of demonstration projects for large鄄scale extension and
                  benefit increase of water鄄saving irrigation systems in 30 provinces ( autonomous
                  regions or municipalities ) as well as water projects constructed by Xinjiang
                  Production and Construction Corps and in pastureland郾 In addition, 31郾 79 billion
                  Yuan from central government finance invested to build small鄄scale farmland
                  waterworks for irrigation and drainage and water supply in rural areas郾 The newly鄄
                  added effective irrigated area reached 1郯 798郯 000 ha; moreover, new鄄added
                  water鄄saving irrigated area was 2郯 725郯 000 ha郾 Meanwhile, 200 million Yuan was
                  allocated to schistosome prevention projects郾

                  Rural hydropower and electrification郾 In 2015, the completed investment of rural
                  hydropower station construction amounted to 24郾 40 billion Yuan; the newly
                  increased hydropower stations were 360, with a total installed capacity of 2郾 41
                  million kW郾 The completed investment for rural electricity network in the whole
                  country was 6郾 4 billion Yuan; the newly increased capacity of 110 kV substation or
                  above was 2郾 95 billion kVA; the newly increased capacity of 35 (63) kV substation
                  was 1郾 77 million kVA; the capacity of distribution transformer was 4郾 55 million kVA郾
                  The newly constructed 10 kV or above high pressure transmission line was 17郯 000
                  km and low pressure line was 30郯 000 km郾