Page 39 - 2010年全国水利发展统计公报
P. 39
2010年 全国水利发展统计公报
2010 Statistic Bulletin on China Water Activities
Investment schedule of schemes of SWIM East Route Prase-Ⅰ
Huaiyin No.3 Station 100 million Yuan
Huaian No.4 Station
Water transfer channel of Huaian No.4 Station
Rehabilitation of Jiangdu Pumping Station
Sanyanghe, Tonghe and Baoyinghe Project
Liushan Pumping Station
Xietai Pumping Station
Lanjiaba Pumping Station
Luomahe Water Resources Control Project
Jiping Main Canal
Hanzhuang Pumping Station
Wannianzha Pumping Station
Taierzhuang Pumping Station
Second Cascade Pumping Station
Crossing Yellow River Scheme
Yaolouhe Sluice
Yangguantunhe Sluice
Jinan Downtown Project
Dashahe Sluice
Liulaojian Second Station
Zaohe Second Station
Siyang Station
Sihong Station
Zaohe First Station
Control Station of Hanzhuang Canal
Changgou Pumping Station
Denglou Pumping Station
Jinhu Station
Donghu Reservoir
Shuangwangcheng Reservoir
Treatment of Irriagtion District Impact on Lianghu Section
Rehabilitation of Huaian No. 2 Station
Jinbao Navagation Scheme
Historical & Cultural Relics Protection Project in Jiangsu
Gaoshuihe Training Project
Lixiahe Water Source Compensation
Impact Treatment of Zhongyunhe at South of Luoma Lake
Baliwan Pumping Station
Datun Reservoir
Historical & Cultural Relics Protection Project in Shandong
Hongze Station
Pizhou Station
Suining No. 2 Station
Total investment Actual investment Accumulated investment completed
34