Page 97 - Water Standards
P. 97

6 Theri g idbod ylimite q uilibriummethodandthefiniteel-
                 ementmethodma ybeusedforthestabilit ydesi g nofrockbolt
                  su pp ortedcranebeam.Theri g idbod ylimite q uilibriummethod
                 forrockboltsu pp ortedcranebeamisseeninAnnexE.
                      7 Full yg routedboltsorp re-stressedboltsma ybeusedas
                 tensileboltsforrockboltsu pp ortedcranebeam.Whenfull y
                  g routedrockboltsareused, theadverseimp actofsurroundin g
                 rockdeformationduetoexcavationbelowontheforcecarr y in g
                  ca p acit yofboltsshallbefull yconsideredandenou g hsafet yallo-
                  wenceshallbemadefororreinforcin gmeasuresshallbetaken.
                                                  p
                  Whenp re-stressedboltsareused,artiall yp re-stressedorfull y
                  p re-stressedstructurema ybeado p tedandthere q uirementsfor
                  secondtensionin gshallbemet.
                      8 Thedesi g nofboltsforrockboltsu pp ortedcranebeam
                  shallmeetGB50086, SL377andSL212.Thesectionoftensile
                  boltsfromrockwallsurfacetocertainde p thintorocksshouldbe
                  ke p tfree.
                      9 Thestructuraldesi g nofcranebeamshallbeinaccord-
                  ancewiththerelevantsti p ulationsforwallt yp econtinuouscor-
                  belinSL191.
                      10 Rockboltsu pp ortedcranebeamma ynothaveex p an-
                 sionj oints , butshallbep rovidedwithex p ansionj ointsincorre-
                 s p ondin glocationswheretherockwallhei g htandg eolo g icalcon-
                  ditionsvar yg reatl yorthestructuralformofbeamchan g es.The
                 tensileboltsforrockboltsu pp ortedcranebeamonbothsidesof
                  ex p ansionj ointsshallbeintensified.
                      11 Constructionj ointsshallbesetonrockboltsu pp orted
                  cranebeamandshouldbes p acedat8 15m.Thej ointfaceshall
                  bep rovidedwithke y wa y sandbetreatedintorou g henedface.
                  Thelon g itudinalreinforcementofcranebeamshallcrossthe

                                                                        9 8
   92   93   94   95   96   97   98   99   100   101   102