Page 59 - 2017年全国水利发展统计公报
P. 59
Continued
Indicators unit 2012 2013 2014 2015 2016 2017
8
(4) hydropower projects 10 Yuan 117郾 2 164郾 4 216郾 9 152郾 1 166郾 6 145郾 8
8
(5) capacity building 10 Yuan 59郾 6 52郾 5 40郾 9 29郾 2 56郾 9 31郾 5
8
(6) early鄄stage work 10 Yuan 40郾 7 40郾 7 65郾 1 101郾 9 174郾 0 181郾 2
8
(7) others 10 Yuan 291郾 1 328郾 2 244郾 2 337郾 5 636郾 2 947郾 5
Notes:
1郾 The data in this bulletin do not include those of Hong Kong, Macao and Taiwan郾
2郾 Water鄄saving Irrigated area in 2013 is integrated with data of first national census
for water郾 Other key indicators for water development and statistical data in 2012
is also integrated with the data of first national census for water郾 Among which,
the length of embankment is further clarified as grade鄄V or above after the data is
integrated with that of first national census for water郾
3郾 The statistics of the number of irrigation districs over 10郯 000 mm from 2012 is
based on designed irrigated area郾
4郾 Statistics of rural hydropower refer to the hydropower stations with an installed
capacity of 50郯 000 kW or lower than 50郯 000 kW郾
摇 摇 摇 55摇