Page 88 - Water Standards
P. 88

7.1.19 Themeasuresforsee p a g econtrol ,draina g eandmois-
                 turep roofofmaincavernsformainp owerhouse ,maintrans-
                 former ,hi g hvolta g eswitch y ard,etc.,shallbedetermined
                  basedonlocalg eolo g icalconditions , h y drolo g icalconditionsand
                  p ro j ectla y outandconformwiththefollowin g s :
                      1 Forcavernclosetothereservoirorrivercourseorinthe
                  areawithabundantg roundwater ,see p a g econtrolanddraina g e
                  shallbeintensifiedatitsfrontsideandrivercourseside.Ifnec-
                  essar y imp erviouscurtainanddraina g etunnelsma ybep rovid-
                        ,
                  edatdifferentelevationsoutsidetheclusterofcavernsandat
                 theto pofp owerhouse,anddraina g ecurtainsma ybep rovided
                 indraina g etunnelstoformadraina g es y stemoutsidethep owe-
                 rhouse.
                      2 Intheareawithabundantg roundwaterorrockmassof
                                  ,
                  hi g hp ermeabilit y thedraina g es y stemoutsidethep owerhouse
                  shouldbeformedbeforetheexcavationofmaincaverns.
                      3 Whentailracesur g echamberisp rovided, thesee p a g e
                  controlanddraina g eonthecavernsideclosetothetailracesur g e
                  chambershallbeenhanced.
                      4 Gravit ydraina g eshallbeado p tedwheneverconditions
                  arep ermitted.
                      5 Ifp ump eddraina g eisneeded, theq uantit yofleaka g e
                  shallbedeterminedaccordin gtotheh y dro g eolo g icalconditions
                  ofsurroundin grocks ,see p a g econtrolanddraina g emeasures ,
                  andatthesametimecollectionwellsanddraina g ep ump in gfacili-
                 tieswithade q uateca p acit yshallbep rovided.
                  7.1.20 Theg eolo g icalex p lorationadits , testtrenchesorother
                        p
                  wells ,itsandconstructionaditsthatma ycausewatertoflow
                 intotheunder g roundp owerhousedurin gconstructionoro p era-
                 tionshallbep lu gg edsafel yandeffectivel y.

                     0 8
   83   84   85   86   87   88   89   90   91   92   93