Ministry of Water Resources Makes Special Deployment for Flood and Rainstorm Defense Against Typhoon Noul (Hongxia)
2026-07-30 09:59

On the afternoon of July 25, Li Guoying, Deputy Commander-in-chief of the State Flood Control and Drought Relief Headquarters and Minister of Water Resources, chaired a special video meeting, joined by officials from the Ministry’s seven river basin commissions and authority. The meeting analyzed and assessed the development path and impacts of the 12th typhoon of the year, “Noul” (known in Chinese as “Hongxia”), reviewed potential risks for each river basin, and systematically arranged flood prevention and response measures against the expected storms and floods.

Li Guoying noted that Typhoon Noul is forecast to make landfall along the coast between Hong Kong and Lufeng, Guangdong, on the night of July 25 to the early morning of July 26. He highlighted its prominent features, including high landing intensity, abundant moisture, wide impact range, and long duration. According to forecasts, from July 25 to 30, some major rivers in the Pearl River, Yangtze River, Huaihe River, Yellow River, and Haihe River basins are expected to see significant water level rises. In particular, the Dongjiang River in the Pearl River basin may experience a numbered flood.

Li Guoying called for focused efforts in six key areas.

First, monitoring, forecasting and early warning should be strengthened. Close attention should be paid to the movement paths and affected areas of Typhoon Noul and its subsequent remnant cloud systems through continuous and rolling monitoring and analysis. The scope of flood and waterlogging risks should be delineated in advance in a precious manner, and early warnings should be issued promptly to reach the frontline of flood defense.

Second, the flood safety of major rivers, large lakes, and key water bodies must be ensured. Unified and coordinated operation of water projects should be strengthened at the river basin level, giving full play to the roles of key reservoir clusters in flood retention, peak clipping and peak staggering, so as to firmly uphold the bottom line of flood safety in each basin.

Third, the risk of flash flood disasters must be minimized. Monitoring and early warning for flash floods should be strengthened, with early warning thresholds dynamically adjusted in response to changes in underlying surface conditions. Responsibilities and measures for the five key links must be strictly implemented: who organizes evacuations, who is to be evacuated, when evacuations should take place, where evacuees are relocated to, and prohibitions on unauthorized return. The evacuation and relocation of people in risky zones should be organized in a timely manner, with no one left behind.

Fourth, safe operation of reservoirs during flood season should be prioritized. For each reservoir, the “three officials in charge” (officials responsible for flood control administration, technology and inspections) and the “three key links” (monitoring and forecasting of rainfall and water conditions, reservoir dispatch and operation, and emergency response plans for flood control and rescue) for reservoir flood control should be fully put in place. Reservoir operation monitoring and early warning should be strengthened. All dangerous or defective reservoirs within the heavy rainstorm area should be emptied, and every effort must be made to prevent dam failures.

Fifth, patrol and guarding of embankments must be reinforced. Risks should be predicted along each section along the embankments, with rescue forces, materials, and equipment pre-positioned. Patrols for inspection and hazard identification, as well as emergency response measures should be stepped up to ensure that no major embankment is breached.

Sixth, defense against both incoming floods and urban waterlogging must be well coordinated. A comprehensive approach featuring “intercepting incoming floodwaters, diverting runoff around the protected perimeter, maintaining internal flood defenses, forced pumping of ponded water” should be adopted. Urban flood and waterlogging (including tidal) drainage and regulation systems should be integrated and coordinated to fend off floods from entering the city and prevent urban waterlogging risks.

Source: INTCE